Coordinate hangers, framing, board layers and access details for ceiling protection.
← Back to rangeSystem illustrationConstruction illustration from the Mingan fire-resistant board catalogue. Confirm details against the selected system documentation.
What to confirm
01
Suspension and fixings
02
Board layers, joints and edges
03
Luminaires, vents and access openings
Design and installation coordination
Provide elevations or panel layouts, installation locations, surrounding construction and performance requirements. Materials, fixings, seals and connections must follow the selected system documentation and agreed drawings.
Verify product and system performance separately
A board reaction-to-fire classification does not establish the fire resistance of a wall, ceiling or encasement. Each performance claim must match the full construction.