HONG KONG · Public facilities
Tsuen Wan Public Library
Doors and fixed glazing on floors 1–5, illustrated in the Mingan 2025 catalogue.

Application reference
Doors and fixed glazing on floors 1–5
Specification considerations
Plan circulation, accessible routes, signage and maintenance alongside the glazing layout, and coordinate the system interfaces with adjacent construction.